+86-17396104357

+86-27-65526007

NEWSnews

Present Position:Home > News > Company News

Dagang Oilfield's "Side Attack" Activates Old Area Oil Reservoirs

Time:2024-05-08 Number:2

As of April 28th, the side drilling of the Lianqian 2-6-1K well in Block 7 of Port East Zone 2 of Dagang Oilfield has maintained a daily oil production of over 10 tons for 68 consecutive days, marking the reactivation of oil reservoirs in high water cut old areas.

image.png

After more than 40 years of development, the seventh block in the second district of Gangdong has reached a water content of 95.2% and has entered the final stage of "double high" development. In order to deeply tap into the remaining oil potential in the old area, researchers from Dagang Oilfield Exploration and Development Research Institute actively rely on sidetracking technology to improve the recovery rate of old wells in low efficiency wells and long-term shutdowns. Researchers have focused on the "ten re understandings", dividing their work into small fragments, refining the potential of oil reservoirs to single sand layers, establishing the injection production well network on single sand bodies, and further implementing the distribution of faults and the distribution range of oil bearing sand bodies through integrated analysis of "wells, earthquakes, and reservoirs". They have identified more than 60 old wells.

In order to ensure that oil well production can be sustained and stable, and to achieve efficient development, scientific researchers highlight innovation driven and efficiency first, and pay attention to lean management throughout the process. Comprehensive measures such as directional updating of side drilling and synchronous improvement of injection production well networks are adopted. The ground location of Block 7 in Zone 2 is in the flood discharge area, and the construction of the well site is limited. Researchers insist on optimizing and adjusting plans, coordinating and integrating to ensure operation, making maximum use of the original wellbore, well site, and ground system, reducing material and construction costs, saving investment costs by 26% to 30%, achieving lightweight production capacity construction, and solidifying the foundation of lateral drilling efficiency construction.

GDZX is a manufacturer of power testing equipment, producing a wide range of products with complete models and providing professional technical support. The phone number is 4000-828-027.