+86-17362949750

+86-27-65526007

NEWSnews

Present Position:Home > News > Technical Article

ZXYTM-Ⅱ Insulating Boots & Gloves Withstand Tester: Enhancing Electrical Safety Verification

Time:2026-02-25 Number:1

In the electric power industry, the integrity of personal protective equipment (PPE) is non-negotiable. Insulating gloves and boots serve as the last line of defense for workers against accidental electric shock. To ensure these tools meet rigorous safety standards, specialized testing equipment is required. The ZXYTM-Ⅱ Insulating Boots and Gloves Withstand Tester is a sophisticated instrument designed specifically for power frequency withstand voltage tests and leakage current measurements on insulating gloves and boots.

image.png

Application and Utility
This testing device is primarily used to assess the insulation performance of rubber gloves and boots. It evaluates key parameters such as leakage current and insulation aging under high-voltage stress. By identifying potential failures before they occur in the field, the ZXYTM-Ⅱ helps prevent electrical accidents and ensures compliance with workplace safety regulations.

Key Technical Features
From a technical perspective, the ZXYTM-Ⅱ is engineered for both precision and efficiency. It allows for the simultaneous testing of three pairs of gloves or boots, significantly improving throughput in high-volume testing environments such as laboratories or maintenance depots. Each of the three test stations features independent leakage current monitoring. This allows the operator to immediately identify and isolate a single unqualified product from a batch, ensuring that only equipment meeting the dielectric strength criteria passes inspection.

The system is designed for user-friendliness without compromising on technical rigor. It provides an intelligent digital display of test results and incorporates an automatic rejection function for non-compliant items. Furthermore, the unit is built with practicality in mind; integrated casters at the base of the test carriage facilitate easy maneuverability within a facility.

Technical Specifications
For engineers and technicians, the core technical parameters are as follows:

1.Input Voltage: 0-220V, 50Hz

2.Output Voltage: 0-30kV (Adjustable)

3.System Capacity: 3kVA

4.Test Capacity: 3 pairs per testing cycle

5.Component Weights:

⑴HV Test Transformer: 35kg

⑵Gloves/Boots Test Car: 70kg

⑶Transformer Control Bench: 45kg

Conclusion
The ZXYTM-Ⅱ Insulating Boots and Gloves Withstand Tester represents a reliable solution for power industry technicians tasked with safety verification. Its combination of multi-sample testing, individual leakage current analysis, and automated pass/fail detection makes it an essential tool for maintaining the high safety standards required in electrical work environments.

GDZX is a manufacturer of power detection equipment, offering a diverse range of products with comprehensive models and providing professional technical support. Contact us at +86-27-6552607 or +86-17396104357.Website: http://en.gdzxdl.com/