Operation Steps and Precautions for SF6 Gas Leak Detector Test
1. Turn on the power switch of the instrument, and the screen light will be on.
2. The LCD screen displays the startup interface, and the instrument enters normal operation after preheating. The initialization will perform a self check on the hardware. The initialization time is approximately 10 seconds.
3. After entering the second screen, the instrument initialization is completed and enters standby mode“ ♥” It will not flash. The standby interface will display "detection value: 0000ppm", "maximum value: 0000", and battery level.
Attention: When initializing the SF6 gas leak detector, it should be kept free of smoke in the ambient air. SF6 gas or choose to stay away from the detection point. After about 10 seconds, the instrument will automatically enter the second screen interface.
4. Perform start stop detection by pressing the "Measure" button on the panel. The instrument enters the detection state“ ♥” It will briefly flash and emit a work prompt sound, and the work indicator light on the handle will slowly light up. When the measured concentration is high, the measurement value on the LCD screen will also continuously increase. The instrument will automatically record the maximum measurement value and compare the real-time measurement value with the previous maximum value. The closer the measurement value is to the maximum value, the more alarm indicator lights will light up, and the frequency of the work prompt sound will also be higher.
5. After using the SF6 gas leak detector, turn the instrument power switch to the off position. Then place the instrument and probe back into the chassis.
6. Charging: When the whole machine is working and the battery level graph is empty, it indicates that the battery level is insufficient. At this time, charging is required
Electrical appliances charge instruments. The specific steps are to plug the randomly carried charger plug into the upper left plug of the instrument, and plug the other end of the charger's two core plug into the AC 220V. At this point, the light is on. Indicates that the instrument is charging, and if charged for 5 hours, the instrument can operate for more than 12 hours.
Precautions for SF6 gas leak detector test
Before starting up, the operator should first carefully read the operating instructions and strictly follow the steps for starting up and shutting down the instrument.
It is strictly prohibited to place the probe gun on the ground, and the probe hole must not be filled with dust, water, or oil. It must not be dropped or damaged to avoid affecting the performance of the instrument.
When starting the measurement, the machine should be turned on in clean air or the "reset" button should be pressed before starting the leak detection.
When the probe is in the detection state for a long time or in a high concentration gas environment, there may be a phenomenon of data not returning to zero, manifested as: repeatedly displaying the measured value or no display of the maximum value; The instrument's sound and light alarm is malfunctioning, or the indicator light keeps flashing. At this point, the instrument probe can be placed in clean air and restarted (it would be better if it could be turned off and waited for 60 seconds before turning on), or the reset button on the panel can be pressed, or a new test head can be replaced.
The SF6 gas leak detector can be used intermittently to ensure the accuracy and lifespan of the instrument.
When operating, it is necessary to hold the host with one hand and the test rod with the other hand. It is strictly prohibited to hold the host or test rod alone, which may cause the host or test rod to sag.
GDZX is a professional manufacturer of secondary protection testing equipment, with a wide variety of instrument and equipment types to choose from. Guodian Zhongxing serves you at 4000-828-027. To learn more, visit GDZX's official website at www.gdzxdl.com.